Free Shipping on orders over US$39.99 mail:[email protected]

Treatment Method and Maintenance Method of Leakage at Valve Packing

SaveSavedRemoved 0
Deal Score0
Deal Score0
  1. The material and type of filler should be selected according to the working conditions;
  2. Install the packing correctly according to the relevant regulations, the packing should be placed and compressed one by one, and the joint should be 30℃ or 45℃;
  3. Packings that have been used for a long period of time, aging, or damage should be replaced in time;
  4. The valve stem should be straightened and repaired after it is bent or worn, and the damaged ones should be replaced in time;
  5. The packing should be installed according to the specified number of turns, the gland should be tightened symmetrically and evenly, and the compression sleeve should have a pre-tightening gap of more than 5mm;
  6. Damaged glands, bolts and other parts should be repaired or replaced in time;
  7. The operating procedures should be followed, except for the impact handwheel, operate at a constant speed and normal force;
  8. The gland bolts should be tightened evenly and symmetrically. If the gap between the gland and the valve stem is too small, the gap should be appropriately increased: the gap between the gland and the valve stem is too large and should be replaced.

Tags:

Labideal
Logo
Register New Account
Reset Password
Compare items
  • Total (0)
Compare